水上物流网为船舶与海洋工程行业提供技术支持与动力,是船舶行业最大门户分类网站
全国: | 上海:
水上物流产品分类
浮桥系泊系统
产品图片
重要参数
    用途 浮桥用

产品简介

SF Marina现在可以提供新的技术,该技术是为在偏远地区或深水区(高达50米)等困难条件下的锚定而开发的。浮动浮桥和防波堤的锚定是一种技术,确保锚定的防波堤或混凝土浮桥保持在所需的位置,不受作用在它身上的力量影响。这是通过确保作用在浮桥上的力的分布方式来实现的,即使在最恶劣的条件下,浮桥也不会被损坏。锚定也可以通过将桩子打入海床来进行。在这些情况下,浮动防波堤或浮桥由外部或内部的导桩器固定在那里。

锚固也可以通过使用螺旋锚来进行,螺旋锚被拧入海床,形成非常坚固的紧固点,可以将链条、绳索或Seaflex电缆连接在一起。在所有情况下,必须根据所预见的力来设计锚固。为每个地方设计一个合适的锚固方案是最重要的。SF Marina使用商业上可用的计算方法作为参考,但在承诺进行锚固设计之前,将无一例外地采用从数以千计的最终项目中获得的艰苦经验。

在任何情况下,锚固都必须根据所预见的力量进行设计。为每个地方设计一个合适的锚固方案是最重要的。SF Marina使用商业上可用的计算方法作为参考,但在承诺进行锚固设计之前,将毫无例外地采用从数以千计的最终项目中获得的经验。

英文介绍

SF Marina can now offer new technique that has been developed for anchoring in difficult conditions such as remote locations or in deep waters (up to 50 meters). Anchoring of floating pontoons and breakwaters is the technique of ensuring that an anchored breakwater or concrete pontoon remains in the desired place independent of what forces are acting upon it. This is achieved by ensuring that forces acting upon the pontoon are distributed in such a way that the pontoon remains undamaged even in the vilest of conditions. Anchoring may also be carried out by driving piles into the seabed. The floating breakwaters or pontoons are in these cases secured in place by either external or internal pile guides.

Anchoring may also be carried out by using screw anchors which are screwed into the seabed resulting in exceptionally strong fastening points to where chain, rope or Seaflex cables can be attached. In all cases anchoring must be designed for the forces foreseen. Designing a proper anchoring solution for each location is of upmost importance. SF Marina uses commercially available calculation methods as reference but will without exception adapt hard earned experience from thousands of finalized projects before committing to an anchoring design.

In all cases, anchoring must be designed for the forces foreseen. Designing a proper anchoring solution for each location is of upmost importance. SF Marina uses commercially available calculation methods as reference, but will without exception adapt hard earned experience from thousands of finalized projects before committing to an anchoring design.